Detail and Contour Survey – Tibooburra

Compass Consulting Surveyors were engaged to undertake a Detail and Contour Survey over a lot located within the Town of Tibooburra. The project involved defining and marking the site boundaries and completing the detail survey using conventional Total Station and RTK GPS methods. A UAV Survey was also undertaken to provide a high-quality aerial image [...]

Detail and Contour Survey – Tibooburra

Rural Subdivision – Paytens Bridge

Compass Consulting Surveyors were engaged to undertake a three-lot subdivision of 630 hectares land zoned RU1 Primary Production at Paytens Bridge. CCS prepared the existing/proposed site plans and Statement of Environmental Effects to accompany the Development Application to Forbes Council and liased with Council to obtain the Subdivision Certificate. The subdivision plan involved redefining [...]

Rural Subdivision – Paytens Bridge

Orange – Sewer Treatment Plant Expansion Project

The $8 million dollar Orange Sewer Treatment Plant expansion project commenced in November 2022. The works included replacing inlet work structures, pipe relocation and road upgrades. Compass Consulting Surveyors were appointed as Surveying Consultants and were responsible for establishing control, construction setout, pre & post concrete pour checks, machine control file preparation and as-built [...]

Orange – Sewer Treatment Plant Expansion Project

Wellington North Solar Farm

The $540 million solar farm project will generate 425MW of renewable energy. The site is situated 7km north of Wellington on the Goolma Road and is approximately 950Ha (2350 acres). Compass Consulting Surveyors were appointed as the Lead Surveying Consultants and provided the following: Detail and Contour Survey over the entire site and surroundings [...]

Wellington North Solar Farm

Wellington Footbridge

The new Wellington footbridge was constructed in 2022 and provides pedestrian access over the Bell River between Cameron Park and Pioneer Park. Compass Consulting Surveyors initially engaged to prepare a Detail and Contour Survey to assist in the design of the bridge and then continued on the project providing pile setouts, formwork conformance and [...]

Wellington Footbridge

Construction Setout – 68-70 Peisley Street, Orange

Compass Consulting Surveyors were engaged to provide Surveying Services for the construction of the four-level mixed use development comprising of 4 office premises, 22 serviced apartments and an underground parking area. The project involved the following: Cadastral boundary definition and site control establishment Setout for earthworks and sewer/stormwater construction Setout gridlines and RL’s. Pre [...]

Construction Setout – 68-70 Peisley Street, Orange

POSI – Wild Dog Fence Extension Project

The NSW Wild Dog Fence Extension Project intends to extend the existing NSW wild dog fence by a further 420km along the NSW/Queensland border.Compass Consulting Surveyors were engaged by the NSW Government to carry out a desktop investigation of existing the cadastral survey marks that may be affected during the construction phase of the project.A [...]

POSI – Wild Dog Fence Extension Project

Molong Community Centre & Library Development

The $5 million Molong Community Centre and Library Development commenced in July 2021. Compass Consulting Surveyors were appointed as Surveying Consultants and were responsible for establishing control, cadastral boundary definition, civil and building setout and as-built surveys.

Molong Community Centre & Library Development

Easements – Manildra to Parkes Transmission Line

Engaged by Transgrid, Compass Consulting Surveyors measured and marked approximately 23km of easements in two sections for a transmission line between Manildra and Parkes. Conventional electronic distance measurement technology was combined with GPS for a fast, efficient job.

Easements – Manildra to Parkes Transmission Line

PCA Survey – Darcy Kennedy Building, Dubbo

Compass Consulting Surveyors measured the Nett Lettable Area of the office building with multiple tenancies and presented the data in the form of a diagram and accompanying report. Many factors had to be considered in order to comply with the complicated legislation applying to the development. Physical constraints on the site mean maximising the use [...]

PCA Survey – Darcy Kennedy Building, Dubbo
Go to Top